Datasheet
Evaluates: MAX17075
MAX17075 Evaluation Kit
2 _______________________________________________________________________________________
Component Suppliers
SUPPLIER PHONE WEBSITE
Fairchild Semiconductor 888-522-5372 www.fairchildsemi.com
Murata Electronics North America, Inc. 770-436-1300 www.murata-northamerica.com
Sumida Corp. 847-545-6700 www.sumida.com
TDK Corp. 847-803-6100 www.component.tdk.com
Toshiba America Electronic Components, Inc. 949-623-2900 www.toshiba.com/taec
Component List (continued)
DESIGNATION QTY DESCRIPTION
C13 1
0.01µF ±10%, 10V X5R ceramic
capacitor (0402)
Murata GRM155R61A103K
TDK C1005X5R1A103K
C18 1
1500pF ±10%, 50V X7R ceramic
capacitor (0603)
Murata GRM188R71H152K
TDK C1608X7R1H152K
C19 0 Not installed, capacitor (1206)
C20 0 Not installed, capacitor (0402)
C21 1
0.22µF ±10%, 25V X7R ceramic
capacitor (0603)
Murata GRM188R71E224K
TDK C1608X7R1E224K
D1 1
3A, 30V Schottky diode (M-Flat)
Toshiba CMS02
(Top Mark: S2)
D2, D3, D4 3
220mA, 100V dual diodes (SOT23)
Fairchild MMBD4148SE
(Top Mark: D4)
JU1 1 3-pin header
JU2, JU3 2 2-pin headers
L1 1
3µH, 3A
DC
inductor
Sumida CDRH6D28-3R0
Q1 0
Not installed, transistor (SOT223)
Recommended: 20V, 1A npn
transistor (SOT223)
Fairchild BCP68
DESIGNATION QTY DESCRIPTION
Q2 0
Not installed, transistor (SOT223)
Recommended: -20V, -1.5A pnp
transistor (SOT223)
Fairchild BCP69
R1 1 10Ω ±5% resistor (0603)
R2 0
Not installed, 100Ω ±5% resistor
(0603) recommended
R3, R4, R5, R7 4 100kΩ ±1% resistors (0603)
R6 1 13.7kΩ ±1% resistor (0603)
R8 1 187kΩ ±1% resistor (0603)
R9, R16 2 20kΩ ±1% resistors (0603)
R10 1 82kΩ ±5% resistor (0603)
R11 1 8.45kΩ ±1% resistor (0603)
R12 1 10kΩ ±1% resistor (0603)
R13 1 10kΩ ±5% resistor (0603)
R14 1 1kΩ ±5% resistor (0603)
R15 1 464kΩ ±1% resistor (0603)
R17 1
10kΩ SMT cermet trimmer, 9 to 15
turns
U1 1
Boost regulator (24 TQFN)
Maxim MAX17075ETG+
— 3 Shunts
— 1 PCB: MAX17075 Evaluation Kit+
Quick Start
Required Equipment
Before beginning, the following equipment is needed:
• +4.5V to +5.5V, 5A DC power supply
• One voltmeter
Procedure
The MAX17075 EV kit is fully assembled and tested.
Follow the steps below to verify board operation.
Caution: Do not turn on the power supply until all
connections are completed.
1) Verify that a shunt is installed across pins 2-3 of
jumper JU1 (VCOM unbuffered).
Note: Indicate that you are using the MAX17075 when contacting these component suppliers.