IMPORTANT: Turn off the power at the main fuse or circuit breaker box before starting installation A bod Crossbar (Ipc) Screw (PCs) Finial (PCs) Screw (apes) Fabric lampshade) Acrylic shade (1pc) Metal washer (SPCA) Locate all hardware & components before discarding packaging 1) Step.1: Put the Fabric shade(E) onto the Ceiling pen (G), then secured by metal washer(H) and screw (D) till tighten one by one Ground wire White wire Black wire = A Denver— Step.