~~ MAXIM PRODUCT NAME: Cebu 5LT Chandelier NUMBER: 14425 Please consult your electrician for Hang fixture and wiring ‘Bosses Bulb (Not included) :5%CA 60W MADE IN CHINA Page 1 of (3)
IMPORTANT: Turn off power at the main fuse or circuit breaker box before starting installation 1A (G)Bracket (H) Canopy (I) Chain (I) Body (L)Bulb Locate all hardware & components before discarding packaging Step. 1:Remove mounting bracket (G) from fixture and install to electrical box. 2.) Step. 2: Attach appropriate amount of chain to loop to achieve desired mounting height. Thread wire through every 3rd loop of chain. (Neutral (positive 3.) Step. 3: Wire fixture to wires in outlet box.
Stems (A-F) Crystal Crystal (A-F) hanging diagrammatic drawing IMPORTANT : Turn off power at the main fuse or circuit breaker box before starting installation Locate all hardware & components before discarding packaging Step. 4:Screw up stems (K) on the bottom of each socket. 5.) Hang the crystal (A-F) follow the left side drawing. Or DIY your own style. Step. 5: 6.) Step. 6: Install the bulb. Cleaning & Care: Clean with soft cloth and a mild detergent. Do not use abrasive cleaner.