IMPORTANT: Turn off the power at the main fuse or circuit breaker box before starting installation Ball Nuthouses) E Mounting Bracket) Screwiness) Canopy) 6" Stem (1PC) 12'8tem @Apes) AT TURBOCHARGE) oo tablespoon) i oy Locate all hardware & components before discarding packaging fiin Ste pl: Carefully remove packaging from fixture. Run wire through stems (E) and combine stem lengths to meet desired mounting height. Then attach canopy (C) to fixture.