Installation Sheet
1. Secured the tube (C) to the part (D) till tight
2. Secured the tube (B2) to the tube (C) till tight
3. Secured the tube (B1) to the tube (B2) till tight
4. Secured the tube (B) to the tube (B1) till tight
5. Secured the ceiling pan (A) to the tube (B) till tight
6. The nut(E) is through round metal(F), shade(C),
then secured by ball (H) till tight
7. Install 5*60W G9 bulbs (J) into socket(I)
of this fixture ( Bulbs included)
8. Hang the large crystal component(ECRB22380-A)
and small crystal component(ECRB22380-B) to
different lenght size steel wire component
ECRS22384-E/ECRS22384-F
By the way, you can hang these crystal components
at yours pleasure, please see the below crystal q'ty:
ECRB22380-A--21PCS
ECRB22380-B--5PCS
ECRS22384-E--10PCS
ECRS22384-F--16PCS