Installation Sheet

1. Secured the tube (C) to the part (D) till tight
2. Secured the tube (B2) to the tube (C) till tight
3. Secured the tube (B1) to the tube (B2) till tight
4. Secured the tube (B) to the tube (B1) till tight
5. Put the ceiling pan (A), metal washer(M), ground wire(O) and metal ring(P) to the tube (B),
then secured by hex nut (Q) till tight
6. The nut(E) is through round metal(F), shade(G), then secured by ball (H) till tight
7. Install 9*40W G9 bulbs (J) into socket(I) of this fixture ( Bulbs included)
8. Hang the large crystal component(ECRB22380-A
) and small crystal component(ECRB22380-B) to different lenght size
steel wire component (ECRS22384-E/ECRS22384-F)
By the way, you can hang these crystal components at yours pleasure
please see the below crystal q'ty:
ECRB22380-A--29PCS
ECRB22380-B--7PCS
ECRS22384-E--12PCS
ECRS22384-F--24PCS

Summary of content (1 pages)