IMPORTANT: Turn off the power at the main fuse or circuit breaker box before starting installation — Bracket (A) Canopy(B) Body © Locate all hardware & components before discarding packaging 1) ® = Step.1: | ® g @sieve (erect wire) Step.2: Wire fixture to wires in outlet box. Install Green wire to Ground Screw. Step 3: Adjust wire length to desired hanging height. Install Canopy (B) to Bracket (A) and tighten screws at the ends of canopy to secure.