Instruction Manual

18” WALL MOUNT
INSTALLATION
30 Samuel Barnet Blvd.
New Bedford, MA 02745
(508) 995-2200
Page 1
PROPER INSTALLATION IS IMPORTANT. IF YOU NEED ASSISTANCE, CONSULT A CONTRACTOR,
ELECTRICIAN OR TELEVISION ANTENNA INSTALLER (CHECK WITH YOUR LOCAL BUILDING SUPPLY,
OR HARDWARE STORE FOR REFERRALS).
Slip the swaged end of mast A into the
round end of mast B.
1
2
WOOD BLOCK
SWAGED END
Tap the two sections together with a hammer.
A piece of wood will protect the end from
damage.
MAST B
MAST A
MAST B
MAST A
Bolt two half-sections together to make one
complete top bracket assembly
3a
7/16”
HAMMER
TAPE MEASURE
7/16” WRENCH
3/8”
3/8” WRENCH
TOOLS
REQUIRED
DRILL WITH
1/8” DRILL BIT
PHILLIPS SCREW
DRIVER
LEVEL
CLAMPING
SCREWS
LAG
SCREW
SWAGED END
SUPPORT
LEG
SLOTTED SCREW
DRIVER
TOP BRACKET ASSEMBLY

Summary of content (3 pages)