Commissioning Site Report
SITE NAME:
LOCATION:
DATE:
COMMISSIONED BY:
ITEM RESULT
All Kingfisher modules installed with correct options
All hardware present and connected (eg. modem)
Fuses installed
Antenna (if present) connected and properly aligned
Mains power wired correctly
DC power wired correctly (correct polarity to battery, radio and
24V Aux supply)
Battery voltage V
RTU Powers up correctly. All OK LEDs ON.
DC Supply Voltages OK (12 and 24V outputs)
RTU configuration loaded
RTU ladder logic loaded
RTU time and date set
RTU detects all modules (Hardware Overview)
Radio (if present) RX Level From Master/Sub Master
Radio (if present) RX Level From Outstation
(for store and forward sites)
Radio (if present) TX Frequency MHz
Radio (if present) RX Frequency MHz
Radio (if present) TX Power W
Radio (if present) TX Reverse Power W
RTU can communicate with other RTUs
Site successfully commissioned
NOTES