Owner's Manual
9 
                                                           .   
FIG-13    Slip cords/wires through corresponding holes                FIG-14 Connecting cords/wires connectors   
13. Connect all the wires and connectors to the corresponding outlets on the Roof Panel. Please be sure all the plugs are 
connected  snug  and  tight.  See  FIG-14.    Next,  pull  down  the  cords/wires  of  the  power  plugs  of  the  speakers, 
temperature sensor, control panel and CD player through the hole near the fan on the Roof Panel. 
14. The CD Player will already be mounted in its wood housing box.    Connect the antenna to the CD player.    Next, feed 
the wires up through the roof.    Connect the antenna into the rear of the radio and connect the radio harness up o the 
roof.    See FIG 15.1    Next, mount the wood housing box to the ceiling of the sauna room.    FIG 15.2 and 15.3. 
Note: CD player may not be available on all model sauna rooms 
  Step 1                                                                        Step 2 
                                                      FIG 15.1 Screw CD Player into sauna room 
                      FIG 15.2 Installing the Radio Wood Housing            FIG 15.3 Screwing in the Radio Wood Housing 










