Installation Guide

PRODUCT INSTALLATION
BOMBAY COLLECTION
REV 111715
PRODUCT INSTALLATION
3
INSTALLATION (continued)
2
Installing support for vanity
Provide 2x6 backing material behind the nished wall to
properly support the vanity.
To properly secure the vanity, the middle of the
required 2x6 backing material must be 31-1/4”
(793mm) from the nished oor.
Extend the backing material beyond the width of the
vanity to the nearest stud. This will ensure proper
support for the vanity.
Front-notch the studs to ensure the 2x6 backing
material is ush against the studs.
Secure the 2x6 backing material to the studs with
framing nails.
Rough-in the water supply and drain lines into the
rough-in plumbing areas of the vanity.
3
Attaching the vanity
Verify the vanity is level and back rail is plumb
against the wall. If necessary, turn the leg levelers
(AA) to adjust the vanity.
Using drill bit, drill two pilot holes through the back
rail and the nished wall. Verify the pilot holes are
positioned to ensure the lag bolts will engage the
2x6 backing material.
Secure the vanity to the nished wall with two 5/16”
lag bolts and washers (not provided).
31-1/4” (793mm)
2”x6” backing material
AA
A