Installation Instructions

- 4 - W10367612A
Pressure Test
Check minimum and maximum inlet gas pressures:
Remove pressure tap plug from gas valve body.
Insert pressure tap finger tighten and connect monometer
hose to the end of the nipple.
Turn on gas supply. If your dryer is equipped with manual
valve, make sure that it is in the on position.
Verify gas inlet pressure is between 8” and 13” water
column.
Turn off gas supply. If your dryer is equipped with manual
valve, make sure that it is in the off position.
Remove monometer and pressure tap and replace plug.
Leak Check
Turn on gas supply. If your dryer is equipped with manual
valve, make sure that it is in the on position.
Brush or spray a soap and water solution onto pressure
tap and union nut and inspect for leaks indicated by
growing bubbles.
If dryer was moved during conversion, use this same
method to check for leaks in the flexible gas supply line
and any fittings between the dryer and the gas supply pipe.
If any bubbles are present, tighten the leaking connection
and retest for leaks.
22. Place drive belt around drum. Install drum into dryer and
finish installation of belt to pulley. Lift idler pulley upward,
loop end of belt under idler, then slide belt onto motor
pulley. See Figure 8.
FIGURE 8
23. Place a small screwdriver or putty knife under the seal at
the top of the bulkhead. Turn the drum by hand one full
turn (counterclockwise), making sure the rear seal is riding
on the bulkhead and not turned under. See Figure 9.
FIGURE 9