Installation guide

9. At this time, makesureall gas,exhaustandelectricalconnectionsarecomplete. Plug
dryer in, and checkoperationby using the checklistbelow.
10. (GASMODELS ONLY) - The burner maynot ignite initially dueto air in the gaslille.
Allowing the dryer to operateon aheatsettingwitl purgetheline. If the gasdoesnot ignite
within five minutes,turn tile dryer off andwait 5 minutes. Besurethe gassupplyto the
dryerhasbeenturnedon. In order to confirm gasignition, checktheexhaustfor heat.
F_AL INSTALLATION CHECK LIST
- Dryer is plugged into electrical outlet and is properly grounded.
- Exhaust ductwork is hooked up and joints taped,
- Plastic flexible duct is NOT used.
- Use only rigid or stiff wailed flexible metal vent materia!.
- Dryer is level with at1 legs fixmly on the floor, with the lock nuts tightened.
- Vinyl feet have been installed.
- Gas Models - Gas is turned on, there are no gas leaks.
- Dryer runs.
- Dryer heats.
- Dryer shuts off.
- Demonstrate use to customer.
PARTS AND LITERATURE ARE PACKAGED INSIDE
OF DRYER DRUM