Installation guide

Vent System Chart
(29" Wide Long Vent Models Only)
Number of Type Box/Iouvered, or
90 ° turns of vent Angled hoods
or elbows
0 Rigid metal 120 ft. (36.6 m)
1 Rigid metal 110 ft. (33.5 m)
2 Rigid metal 100 ft. (30.5 m)
3 Rigid metal 90 ft. (27.4 m)
4 Rigid metal 80 ft. (24.4 m)
5 Rigid metal 70 ft. (21.3 m)
Install Vent System
1. install exhaust hood
.==_---12" rnin.
(305 ram)
install exhaust hood and use caulking compound to seal
exterior wall opening around exhaust hood.
_2. Connect vent to exhaust hood
Vent must fit over the exhaust hood. Secure vent to exhaust
hood with 4" (102 mm) clamp. Run vent to dryer location
using straightest path possible. Avoid 90° turns. Use clamps
to seal all joints. Do not use duct tape, screws, or other
fastening devices that extend into interior of vent to secure
vent, because they can catch lint.
Make Gas Connection
1. Connect gas supply to dryer
Flared
male fitting
Remove red cap from gas pipe. Using a wrench to tighten,
connect gas supply to dryer. Use pipe-joint compound
on threads of all non-flared male fittings, if flexible metal
tubing is used, be sure there are no kinks.
NOTE: For LP gas connections, you must use pipe-joint
compound resistant to action of LP gas. Do not use
TEFLON ®ttape.
2, Plan pipe fitting connection
B
A. 3/8" flexible gas connector
B. 3/8" dryer pipe
C
C. 3/8" to 3/8" pipe elbow
D.3/8" pipe-to-flare adapter fitting
A combination of pipe fittings must be used to connect dryer
to existing gas line. A recommended connection is shown.
Your connection may be different, according to supply line
type, size, and location.
3. Open shut-off valve
Open shut-off valve in supply line; valve is open when handle
is parallel to gas pipe. Then, test all connections by brushing
on an approved noncorrosive leak-detection solution.
Bubbles will show a leak. Correct any leaks found.
12 1®TEFLON is a registered trademark of E.I. Dupont De Nemours and Company.