Owner`s manual

DANGER
A
There are rotating cutting blades inside the Chipper/
Shredder housing that will cause serious injury. DO
NOToperatemachlns unlessChlpperChuteand Shred-
der Hopper are seourely installed.
J~P 1: UNPACKING AND CHECKING
CONTENTS
Locate and remove Chipper Chute/Shredder Hopper
assembly and debrii tamper from carton.
Locate and remove parts bag.
Cut all four corners of carton from top to bottom and lay flat.
Remove bracket from supportandcut nylon ties from axle.
Pull the Chipper/Shredder off of the pallet.
Properfy dispose of discarded c&ton and pallet.
Compare contents with the contents of parts bag. If any
parts are missing or damaged, corrtaot your local service
dealer or call for factory service.
.$TEP2: INSTALL SHREDDER HOPPER
Rotate Shredder/1-foppsr tube upward to latched position.
~ With Shredder Hopper handle (iem B) pointing away from
the engine and the rectangular opening facing upward,
positiintheround opening of the Shredder Hopper (item A)
over the round steel chute tube (item D) (See FIG. 2-
ASSY).
Align top hole inthe ShredderHopperneck with the top hole
in the steal chute tube.
Assemble six(6) l/4-20x .50screws, pm,vided in parts bag,
through afignsd holes. Do not tighten. “” ““
Position Hopper in position level with the unit and tighten all
six (6) screws seourely.
STEP 3: INSTALLCHIPPER CHUTE
Remove flatwashers and locking nuts (iem B) from the
three (3) threadad studs (See FIG. 3-ASSY).
. Positiin Chipper. Chute assembly (item A) in opening in
housing and over the three (3) threaded sttids. Place v-
shapsd bottom lip of Chipper Chute into opening first and
raise Chipper Chute until remaining two (2) studs are
through the top holes.
..
Assem~efletwashersand locking nutstothree (3)threaded
studs and f&ten securely.
290