Operation Manual

Model Standby time, mini-
mum hours per day
600 m
2
10
500 m
2
12
400 m
2
14
4.7.1 Example 1
This example is applicable to products with a
specified work area of 500 m
2
, but the principle is
the same for the other models.
Schedule setting, Period 1:
08:00 - 22:00.
Active period (A): 08:00 - 20:00.
The schedule settings ensure that the product
begins cutting the lawn at 08:00. However the
product is parked in standby mode in the
charging station from 20:00 and rests until it
starts cutting again at 08:00.
If the schedule setting is divided into 2 work
periods, the standby period can be divided into a
number of periods. The minimum standby period
time must however be according to the Standby
time table.
24 h
A
B
Mowing
Charging
Standby
Operation
Example: A specified work area of 500 m
2
Operation, A = max. hours 12
Charging/Standby, B = min. hours 12
4.7.2 Example 2
This example is applicable to products with a
specified work area of 500 m
2
, but the principle is
the same for the other models.
The schedule settings can be divided into 2 work
periods to prevent mowing when there usually is
other activities ongoing. If the schedule settings
are divided into 2 work periods, the standby
period is divided into several periods. The total
standby period must however be according to the
Standby time table.
Schedule setting Period 1 (A):
08:00 - 17:00.
Schedule setting Period 2 (C): 20:00 - 24:00.
Active period (A): 08:00 - 17:00
Active period (C): 20:00 - 23:00.
The product operates between 08:00 and 17:00.
It starts again at 20:00 but stops at 23:00 due to
standby mode until next start at 08:00.
Mowing
Charging
Operation
Operation
Standby
S
t
and
by
Example: A specified work area of 500 m
2
Operation, A + C = max. hours 12
Charging/Standby, B + D = min.
hours
12
4.8 To charge the battery
When the product is new or has been stored for a
long period, the battery can be empty and needs
to be charged before starting. In the normal
mode, the product automatically alternates
between mowing and charging.
28 - Operation 985 - 004 - 22.01.2019