User manual

McDATA Sphereon 4300 Fabric Switch Installation and Service Manual
iv
Contents
Task 2: Unpack, Inspect, and Install the Product.........................2-3
Unpack and Inspect Switch......................................................2-3
Desktop Installation..................................................................2-4
Rack-Mount Installation...........................................................2-5
Task 3: Configure Product at the EFCM Basic Edition Interface2-6
Configure Product Identification ............................................2-7
Configure Date and Time.........................................................2-8
Configure Parameters...............................................................2-9
Configure Fabric Parameters.................................................2-11
Configure Network Information...........................................2-12
Configure Basic Port Information.........................................2-14
Configure Port BB_Credit.......................................................2-15
Configure Port NPIV...............................................................2-16
Configure SNMP .....................................................................2-16
Enable CLI................................................................................2-17
Enable or Disable Host Control.............................................2-18
Configure SSL Encryption......................................................2-19
Install PFE Keys (Optional)....................................................2-20
Configure Interswitch Links..................................................2-22
Task 4: Configure Product Network Information (Optional)...2-23
Task 5: Cable Fibre Channel Ports................................................2-26
Task 6: Configure Zoning (Optional)...........................................2-26
Task 7: Connect Product to a Fabric Element (Optional)..........2-27
Task 8: Register with the McDATA File Center..........................2-28
Chapter 3 Maintenance Analysis Procedures
Factory Defaults................................................................................3-1
Quick Start.........................................................................................3-2
MAP 0000: Start MAP......................................................................3-5
MAP 0100: Power Distribution Analysis ......................................3-9
MAP 0200: POST Failure Analysis...............................................3-10
MAP 0300: Loss of Browser PC Communication.......................3-11
MAP 0400: FRU Failure Analysis.................................................3-14
MAP 0500: Port Failure or Link Incident Analysis....................3-16
MAP 0600: Fabric or ISL Problem Analysis................................3-27
Chapter 4 Repair Information
Procedural Notes..............................................................................4-1
Power On Switch..............................................................................4-2
Power Off Switch..............................................................................4-3