Install Instructions

Series 751P/ 752P
• Before using product, read and understand instructions.
• Save these instructions for future reference.
All work must be performed by qualified personnel trained in the proper application,
i n s t a l l a t i o n , and maintenance of plumbing and electrical equipment and/or systems in
a c c o r dance with all applicable codes and ord i n a n c e s .
Boiler manufacturer schematics should always be followed. In the event that the boiler
manufacturer’s schematic does not exist, or is not available from the boiler manufacturer,
refer to the schematics provided in this document.
To prevent serious burns, allow the control and surrounding equipment to cool to 80˚F
(27˚C) and allow pressure to release to 0 psi (0 bar) before servicing.
To prevent an electrical fire or equipment damage, electrical wiring insulation must
have a rating of 167˚F (75˚C) if the liquid's temperature exceeds 180˚F (82˚C).
This low water cut-off must be installed in series with all other limit and operating controls
installed on the boiler. After installation, check for proper operation of all the limit and
operating controls, before leaving the site.
When using mixed voltages, do not jumper from terminal 1 to terminal 3.
To prevent electrocution, when the electrical power is connected to the control,
do not touch the terminals, or electrical wires.
To prevent electrical shock, turn off the electrical power before making electrical
connections.
Failure to follow this warning could cause property damage, personal injury or death.
WARNING
Series 751P
Series 752P
Probe Type Low Water Cut-Off
Applications:
Primary conductance type control for
commercial or industrial hot water boilers.
Secondary control for commercial or
industrial steam boilers.
McDonnell & Miller
Installation & Maintenance
Instructions
MM-283

Summary of content (8 pages)