Specifications
Page 28 of 36 / IM 1059-1
Troubleshooting
The in and outs of R-410A
R-410A is a non-ozone depleting blend of two refrigerants
-HFC-125andHFC-32inaftypercentmixture.R-410A
exhibits higher operating pressure and refrigeration capacity
than R-22. R-410A is intended for use in new air conditioning
applications that have traditionally been used HCFC-22 (R-
22). Due to higher capacity and pressure of R-410A, it must
not be used in existing R-22 systems.
AlthoughR-410Aisnon-ammableatambienttempera-
ture and atmospheric pressure, it can become combustible
under pressure when mixed with air.
Note: R-410A should not be mixed with air under
pressure for leak testing. Pressure mixtures of dry
nitrogen and R-410A can be used for leak testing.
Lubrication
R-410A should be used only with polyester (POE) oil.
The HFC refrigerant components in R-410A will not be
compatible with mineral oil or alkylbenzene lubricants. R-
410A systems will be charged with the OEM recommended
lubricant, ready for use with R-410A.
Charging
Due to the zeotropic nature of R-410A, it should be
charged as a liquid. In situations where vapor is normally
charged into a system, a valve should be installed in the
charginglinetoashtheliquidtovaporwhilecharging.
Make certain that the recycle or recovery equipment used
is designed for R-410A. The pressure of R-410A refrigerant
is approximately 60 percent greater than that of R-22. Pres-
sure gauges require a range up to 800 PSIG high side and 250
PSIG low side. Recovery cylinders require a 400 PSIG rating
– do not put R-410A in a 300 PSIG rated cylinder.
Note: Because a water source heat pump operates
under a wide range of water and air temperatures, the
values printed below are to be taken as suggested
pressure and temperatures.) All McQuay water
source heat pumps are designed for commercial
use. The units are designed for the cooling
mode of operation and fail safe to cooling. The
reversing valve is energized for the heating mode of
operation.
Superheat Head Pressure Water Delta T
8 to 14 degrees 335-355 PSIG 10° to 14°
All information above is based on ISO standard
13256-1 and tested at these conditions.
General Maintenance
1. Normal maintenance on all units is generally
limitedtolterchanges.Unitsareprovidedwith
permanently lubricated motors and require no oiling
even though oil caps may be provided.
2.
Filter changes are required at regular intervals. The
time period between changes will depend upon
the project requirements. Some applications such
as motels produce a lot of lint from carpeting and
linen
changes,andwillrequiremorefrequentlter
changes.Checkltersat60-dayintervalsfortherst
year until experience is acquired. If light cannot be
seen
throughthelterwhenhelduptosunlightor
a bright light, it should be changed. A more critical
standard may be desirable.
3.
The condensate drain pan should be checked
annuallyandcleanedandushedasrequired.
4. Record performance measurements of volts, amps,
and water temperature differences (both heating and
cooling). A comparison of logged data with start-up
and other annual data is useful as an indicator of
general equipment condition.
5.
Periodic lockouts almost always are caused by air or
water problems. The lockout (shutdown) of the unit
is a normal protective result. Check for dirt in the
water
system,waterowrates,watertemperatures,
airowrates(maybeadirtylter),andair
temperatures. If the lockout occurs in the morning
following a return from night setback, entering air
below machine limits may be the cause.
Recycle/recovery equipment must be designated for R-
410A. R-410A pressure is greater than R-22. Improper
equipment can cause severe injury or death.
WARNING