Filter Access
Eachunitisshippedwithalterbracketforsidelterremov-
al.Forbottomremovalpushthelterupintotopbracketto
gainclearanceofbottombracketandremovethelter.Also,
asheetmetalductlterretainercanbefabricatedwhenreturn
airductworkisused.
Figure 1: Hanger bracket location dimensions - sizes 007
thru 060
B
Coil
Airflow
E
C
D
Comp
Control
Box
Fan
Assembly
A
Table 1: Hanger bracket dimensions
UNIT DIMENSIONS (mm)
SIZE A B C D E
007 – 009 445 864 559 864 508
012 445 1016 559 1016 508
015 – 024 445 1067 559 1067 508
030 – 036 470 1168 584 1168 533
042 – 070 648 1321 762 1321 711
UNIT DIMENSIONS (INCHES)
SIZE A B C D E
007 – 009 17.5 34 22
34
20
012 17.5 40 22
40
20
015 – 024 17.5 42 22 42 20
030 – 036 18.5 46 23 46 21
042 – 070 25.5 52 30 52 28
Figure 2: Hanger bracket detail - sizes 007 thru 060
3/8" Threaded Rod
(By Others)
Vibration Isolator
Washer
Hex Nuts
(By Others)
Bolt & Lock
Washer
Unit Location
1. Locate the unit in an area that allows for easy removal
ofthelterandaccesspanels.Leaveaminimumof18"
of clearance around the heat pump for easy removal
of the entire unit (if necessary), and to perform routine
maintenance,ortroubleshooting.Providesufcientroom
tomakewater,electricalandductconnections.
2. Thecontractorshouldmakesurethatadequateceiling
panel access exists, including clearance for hanger
brackets,ductcollarsandttingsatwaterandelectrical
connections.
3. Allowadequateroombelowtheunitforacondensatetrap
anddonotlocatetheunitabovepipes.
4. Eachunitissuspendedfromtheceilingbyfourthreaded
rods.Therodsareattachedtotheunitcornersbyahanger
bracketthrougharubberisolator.
Do not use rods smaller than shown in Figure 2. The rods must
be securely anchored to the ceiling or to the bar joists.
CAUTION
5. Eachunitisfurnishedwithahangerkit.Thekitis
shippedunassembledandincludeshangerbrackets,
rubberisolators,washers,boltsandlockwashers.Layout
the threaded rods per the dimension in Figure 1 and the
detail in Figure 2.
6. Whenattachingthehangerrodstotheunit,adoublenut
isrecommendedsincevibrationcouldloosenasingle
nut.Theinstallerisresponsibleforprovidingthehexnuts
when installing hanger rods.
7. Leaveminimum3"(76mm)extrathreadedrodbelowthe
doublenutsorminimum3"(76mm)clearancebetween
topofunitandceilingabovetofacilitatetoppanel
removal for servicing.