Installation guide

26
4-INSTALLATION AND ASSEMBLY
WOODEN BEAM INSULATION
If you wish to mount a wooden beam, it must be protected with adequate insulation from the hot parts in order to prevent the risk of re
or damage to the cladding.
STANDARD CLADDING ASSEMBLY
The installation guide found in each specic cladding must be referred to for the assembly of MCZ product specic claddings.
FRAME ASSEMBLY
Once the cladding and/or the plasterboard wall is set up, t the frame.
This frame is meant for nishing and covering the gap between the metal structure of the product and the cladding.
The four screws for xing the frame are already screwed to the lateral columns. Simply open the door of the product, insert the frame as
shown in the gure, loosen the screws xed to the columns and tighten them fastening the frame to the structure.
1 - INSULATION APPLIED OR TO BE APPLIED
2 - WOODEN BEAM
3 - MARBLE OR OTHER MATERIAL
FRAME
SCREWS
LATERAL COLUMNS