Installation guide
31
5-PRECAUTIONS BEFORE START-UP
Technical Dept. - All rights reserved - Reproduction is prohibited
It is good practice to guarantee eective ventilation in the room during the initial start-up, as the product will emit
some smoke and smell of paint.
Do not stand close to the product and air the room. The smoke and smell of paint will disappear after about an hour of operation, however,
remember they are not harmful in any case.
The stove will be subject to expansion and contraction during the start-up and cooling phases, therefore light creaking noises may be
heard.
This is absolutely normal as the structure is made of laminated steel and must not be considered a defect.
Make sure the plumbing system is sealed perfectly and that there are no leaks or pressure drops.
Make sure that all cut-o valves between the product and the system are open.
Make sure you have bled all air out of the system before start-up.
Make sure that internal devices work properly (ow switches, thermostats, etc.). Make sure that the combustion chamber and the chimney
are clean, and that the plumbing circuit is free of obstructions.
The basic settings ensure proper operation and prevent overheating during the rst ignitions.
SETTINGS TO BE CARRIED OUT BEFORE THE INITIAL START-UP
SWITCHING ON/OFF
Once the power cable is connected in the rear part of the product, bring the switch, which is in the pellets loading door, to position (I). The
illuminated pushbutton switch will turn on.
The product remains switched o and the panel shows a rst screen displaying OFF, by pressing any button a screen displaying MENU will
appear.
The product is switched on and o by pressing key B on the control panel for 2 seconds.
After a start-up phase that lasts approximately 15 minutes, the product starts to work in steady-state conditions.
After switching o the product by pressing key B on the control panel, the cooling stage begins, which involves interruption of fuel
loading, brazier cleaning and ventilation until the product is suciently cool.
FEED SCREW LOADING
This function can only be activated when the product is o and allows the pellets to be loaded into the loading system (feed screw). It
can be used each time it runs out of pellets in the hopper (see alarm A02). It is useful to prevent failed start-ups (alarm A01) due to the
hopper being empty.
To activate the FEED SCREW LOADING function, with the product switched o, from the control panel enter the SETTINGS entry, select
FEED SCREW LOADING and ON. When the pellets start falling into the brazier deactivate FEED SCREW LOADING and switch on the product
CONNECT THE POWER
CABLE
I/O SWITCH










