PB-230 Instruction Manual
PB-230 Instruction Manual 115cm 5cm 3 2 4 1 FUSE AD1 (optional) DC output connector (optional) DC output connector (standard) AD1 UNICABLE 89M103-4P or equivalent 3 4 2 PIN NO. OUTPUT 1 1,2 +V 3,4 -V [ housing: Anderson 1327FP(red), 1327G6FP(black) contacts: Anderson 261G2 (45A) or equivalent ] Red(+V) Black(-V) WARNING : Please make sure the polarity of the battery is connected correctly! Assembly Procedure : 1.
Status Under General Operation: At the beginning stage of operation, the charger provides the largest current with 13.6Vdc of output voltage (for 12V batteries) to charge batteries. The LED indicator will lighten in red. After a period of time (probably a couple of hours, based on the capacity of batteries), the charging current will decrease gradually. After reaching 10% of its maximum value, the charger will go into "floatingcharge" stage. The LED indicator will turn to green.
Notes On Failure Elimination Status No output voltage Possible Reasons Wrong polarity of the battery connection Can't achieve the FLOAT (green light) stage after Batteries are aging or broken long period of charging operation Ways to Eliminate Repair required.