Specifications

Introduction JCL or DSN Catalog?
Chapter 7. Running Jobs With BIM-EPIC 7-3
JCL or DSN Catalog?
For output datasets, JCL parameters always override corresponding DSN Catalog information.
However, JCL period retention must be greater than zero to override a DSN Catalog value.
For input datasets, DSN Catalog values override any corresponding JCL parameters, with the
following exceptions:
EXTENT size (DLBL or DD SPACE parameter)
density (TLBL)
block size or CISIZE (DLBL or DD DCB parameter)
period retention (days) and expiration date
Description