DAYBED FRAME SET-UP INSTRUCTIONS B (x1) (1) plywood frame B A Step 1 Unroll plastic film to release foam cushions. A (x1) (2) covered foam cushions (6) maple feet A Step 2 Dress (A) foam in cover with holes. Place foam zipper facing down. Leave unzipped. Step 3 Flip and align plywood over the covered foam with the metal t-nuts and warning label facing down. Step 4 Place plywood on top Step 5 Zip cover to close. Step 6 Screw feet into holes. Use rubber grips to tighten.