Specifications

OPERATION
eng 73
3. Turn the ignition key switch back to the "OFF" position, and
squeeze the primer bulb until it feels firm. Turn the ignition
key switch to the "ON" position again for three seconds.
Continue this procedure until the fuel line primer bulb stays
firm.
Before starting, read the prestarting check list and special
operating instructions in the Operation section.
STARTING PROCEDURE
1. Lower the outboard to the "RUN" position. Make sure all the
cooling water intake holes are submerged.
26837
2. Open the fuel tank filler cap vent screw (manual venting fuel
tanks).
19748
3. Position the fuel line primer bulb so the arrow on the side of
the bulb is pointing up. Squeeze the fuel line primer bulb
several times until it feels firm.
27348