5.24 and 5.32 N3V CONDENSING GAS – FIRED WALL MOUNTED STAINLESS STEEL BOILER Heating only or with external tank and Solar System INSTRUCTIONS FOR INSTALLATION OPERATING AND MAINTENANCE AUSTRALIAN VERSION For Sales and Service contact; AGENT Automatic Heating Pty Ltd 51 Assembly Drive, PO Box 356 Tullamarine Vic 3043 Australia Telephone: +61 3 9330 3300 Facsimile +61 3 8318 7319 Email: sales@automaticheating.com.au | www.automaticheating.com.
WARNING Before filling the heating system , new or existing, is necessary to check that it will be clean and there will be not impurity and/or residual and then let in a suitable inhibitor 2
INDEX INDEX.............................................................................................................................. 3 BOILER DIAGRAM AND LEGEND CONENSA 5.24 e 5.32 N3V .................................... 5 CHARACTERISTICS, DIMENSIONS AND TEMPLATES ............................................... 6 1 USER INSTRUCTIONS .................................................................................................... 7 1.1 General warnings................................................
3 SERVICING INSTRUCTIONS ........................................................................................ 34 3.1 First start-up tests. ................................................................................................... 34 3.2 Settings (stand alone settings) ................................................................................ 34 3.3 Gas pressure regulation. ......................................................................................... 37 3.5 Boiler diagnostic ..
BOILER DIAGRAM AND LEGEND MERIDIAN 5.24 e 5.
CHARACTERISTICS, DIMENSIONS AND TEMPLATES 58 335 58 845 850 Ø1 2 2 Ø1 vista frontale 60 16 1 2 3 4 5 6 7 65 48 42 91 450 Ø80 113 42 B Ø60/100 69 36 35 40 145 137 236 65 68 . 135 (mod. 3.15 5.24) 280 (mod.5.32) 250 65 1)CH flow ¾\“ 5)CH return 3/4“ MERIDIAN N3V 2)Flow tank 3/4 6)Gas inlet 1/2“ HEAT INPUT kW 26.6 33.3 5.24 5.32 HEAT OUTPUT 80°C FLOW 60°C RETURN MJ/hr 96 120 91 65 68 71 3)Flow tank 3/4 “ 7)Condense drain HEAT OUTPUT 50°C FLOW 30°C RETURN 23.4 29.
1 USER INSTRUCTIONS 1.1 General warnings. This instruction Booklet constitutes an integral and essential part of the product. Make sure that it is always left near the appliance. Please, read carefully the advice and warnings contained in this section as they provide important indications on the boiler use.
1.2 First start-up. Before the first start-up, please check that the system is properly filled with water and that it has pressure 1 ÷ 1.3 bar, then proceed as follows: • open the gas valve; • turn the selector (36) on the only DHW function or on the DHW/CH function; • Our remote control operation (Optional RC).
0 21 3 15 9 18 6 12 PRESS THE BUTTON IP MORE THAN 3 SECONDS TO ENTER IN INFO MODALITY PRESS THE BUTTON OK FOR MOVE FROM A WINDOW TO ANOTHER TILL ARRIVE TO THE “K REG” FUNCTION WITH UP E DOWN BUTTONS IT’S POSSIBLE TO CHANGE THE EXTERNAL TEMPERATURE CURVE. REFER FUNCTIONING CURVES FIG.3 PRESS THE BUTTON OK FOR MOVE FROM A WINDOW TO ANOTHER BUILDING SIZE PARAMETER: WITH UP AND DOWN BUTTONS IT’S POSSIBLE TO CHANGE THE VALUE.
Bolier Temperatur Cutting at 45°C at low temperature . Fig. 3 External temperature N.B.: in systems with zones with different temperatures, the factor available with the low temperature room thermostat closed goes from 0.5 to 6 but the supply temperature is limited to 45°C whereas with a high temperature room thermostat request, it goes from 2.5 to 6 with a maximum temperature of 85°C. 1.3 Signals and diagnostics Fig.
Table 4 code fault Type of block F1 No start-up or no flame detected Manual resetting is required F2 Safety thermostat intervenes Manual resetting is required F5 Faulty supply sensor It automatically resets if fault disappears F7 Fault on flue gas sensor resistance Fixed with automatic reset – signaling for 24 hours F8 Faulty external probe It automatically resets if fault disappears F 10 Lack of water circulation on primary It automatically resets if fault disappears F11 Hydraulic pre
N.B.: do not activate the solar system if the optional 2 sensor kit has not been installed because this may cause the system to malfunction and you may have to call the service centre to resume boiler operating 1 2 Fig.
1.8 Definitive dismantling. In the event of the boiler definitive dismantling, it is to be performed by qualified personnel. Make sure that also the electrical, hydraulic and fuel supplies are disconnected 1.9 Problems, causes and solutions.
2 INSTALLER INSTRUCTIONS 2.1 Boiler installation 2.1.1 General rules The boiler installation is intended to be fixed and it must be carried out by professionally qualified staff, according to the actual national and local law, following all the instructions and rules contained in this manual. The boiler shall be installed in a room free of corrosive steam. After unpacking the boiler, ensure the integrity of the content: in doubt, do not use the apparatus and refer to the supplier.
Clearances shall provide provision for service access and protection from combustible surfaces. Minimum clearances from combustible surfaces shall be 50mm at sides, 300mm from top and 300mm from bottom. ENSURE THAT THE AIR ENTRY IS NOT OBSTRUCTED BY ADJACENT CABINETS OR OTHER STRUCTURES. 2.2 Installation If our accessories are used to install the boiler, read the instructions enclosed carefully. After choosing the suitable position to install the boiler, fit the installation template (see fig. 2).
2.4 Condensate drainage system. The condensate produced inside the boiler must be drained. Therefore the boiler is provided with a condensate trap. The condensate trap fitting is to be connected to a ∅ 32 mm PVC condensate drainage system. It is recommendable to install a further water trap on the condensate drainage system before the condensate reaches the sewer. Only plastic tubes of the standard civil condensate drainage systems are suitable to drain the condensate towards the sewer of the house. 2.
Professionally qualified personnel shall verify that the electric supply system is adequate to the apparatus maximum power (140 W please see the rating plate), and that the wiring section is suitable to the power absorption of the machine. The use of electric adapters, extension cords or sockets are not recommended, but it is convenient to provide the system with a double-pole switch having at least 3 mm spaced electric. Before connecting the boiler, make sure that the power grid and main switch are off.
SSB SE (optional) 9 18 15 21 0 12 3 6 B: blue G : yellow M : brown N : black W : white V : green SF Kit 2 sonde SolarSystem morsetti a vite esterni wiring SSP Colors key SR SS Fig.
Adjustment trimmer PBC P4: maximum fan speed P2:minimum fan speed P5:fan speed during ignition P7: thermo setpoint or k factor setting with external probe present DIP switches: the board (see Fig.
potentiometer. In this way, you can adjust the flow temperature ±5°C by keeping the curve slope adjusted on trimmer P7 as described in Chap. 1. Turning knob clockwise completely till maximum, there will be a temperature rainsing 25°C. This could will be useful in the mid seasons when the external temperature is high and the flow temperature too low to heat the house. Here are the approximate temperatures set on trimmer P7 if it is used to adjust high or low temperature.
no control on the boiler functions which depend on the control panel commands. If the boiler has to operate at low temperatures and has remote control, simply select the required temperature directly on the remote control unit. When operating with the remote control without other thermostats (single zone system) jumpering must not be used on the room thermostat wires. 2.
An example of a hydraulic diagram for mixed temperature systems is given below. A mixing system as SILE TBA/TBA-M, must be used. The boiler will operate at the best temperature for optimising thermal comfort and energy performance.
2.11 Filling the condensate drainage system. Take off the plug on the condensate drainage system and fill it with water amounting to 1 glass so that flue gases do not come out. Attention. Do not operate the boiler if the condense drainage system is empty. It may cause intoxication from burnt gas. 2.12 System start-up. Before starting up the boiler, check that the relevant actual rules have been performed.
CONDENSA 5.32 III BY PASS II I T A 2.14 Zone system In the hypothesis of a system supplied by several zone valves, they are supposed to be connected correctly to avoid the boiler pump functioning when all valves are closed. The following diagram shows how to connect them. Before connecting, check that the ends of the two wires from the room thermostat are not alive. Diagram available also with a remote control (optional) after configuring the boiler control board as instructions (page.
2.17 Safety valve Hot Water Storage tank (where used) The safety valve with is calibrated at 8 bar pressure. During the heating of the contents a dribble from unloading under certain conditions is predictable and normal. During installation direct the unloading valve to drainage duct. If dribble continue also with hot tank and boiler stop check the supply pressure :if this exceeds 5 bar apply a pressure reducer and check the safety valve to have an efficient drainage.
*** In positioning the terminals, distances must be no less than 500 mm when they are near to materials sensible towards the action of combustible products (i.e.: plastic eaves and gutters, wooden overhangs, etc.) unless suitable protective measures are taken. The boiler is homologated with chimney configuration type: B23P . C13 . C33 . C43 . C53 . C83 2.20 Configuration type B23 open chamber and forced draft.
cutting an extension of 1 m at the required dimension. The air/flue duct must be installed on a perfectly horizontal position since it already has a minimum standard slant which prevents the condensate from dropping and freezing on the ground. The duct will be fixed following the relevant figures. 1. Cut the hole in the wall for the air/flue duct. Its minimum diameter should be sufficient to allow the insertion of a plastic duct (as long as the wall and with ø130 mm) which will be sealed with mortal.
Vista A 87 A) Concentric air/flue ducts for roof outlet with PP outlet inner, ø 60/100 mm B) Lead flashing roofing tile C) Vertical flanged concentric compression fitting ø 60/100 mm with taps for air/flue drawing and PP inner duct, silicone lip gaskets and neoprene gasket. The vertical terminal can be connected to a coaxial air/flue duct (ø60/100 mm) having also an horizontal part. The maximum total length of the duct should be 4 m + 2 bends or 5 m without bends.
2.23 Separate air inlet/flue outlet system. Type C43 Please see also the specific catalogue "Air/flue Kits" - KIT AC for further information. Metallic sheath Seal with silicon or mortar of Sigillare con silicone cement o malta di cemento Seal with mortar of Guaina metallica Sigillare con malta cement di cemento Plastic sheath Slope 5 mmverso il Inclinare basso di 5 mm/m. downwar downwar 1 2 4 Attention. The outlet flange adaptor shown must not be used.
or 1 m. extensions as necessary for a total of 18 linear meters. Pay particular attention to the catches as they must guarantee the complete sealing of air and flues. Each piece, either horizontal or vertical, must be suitably fixed to a wall or ceiling with proper supports or brackets. The path and the length of the ducts should consider that the total approved loss of capacity is 11 mm c.a. = a ~ 110 Pa. • For each meter of either air inlet or flue outlet ø 80 mm tubing, the average loss of charge is 0.
Guaina metallica Sigillare con silicone o malta di cemento Sigillare con malta di cemento Guaina in PVC Inclinare verso l'alto di 5 mm/m. 1 Inclinare verso il basso di 5 mm/m. 2 4 Aspirazione aria Ø80 120 Espulsione fumi Ø80 6 1) Flue outlet terminal with grill. 2) Ø80 M.F. pipe (it can be shortened if necessary or extended up to 20 m with 1 m or 0,5 m). 3) Multi-directional 90° bends Ø80 M.F. 4Air inlet terminal with grill. 6) Taps for flue/air analysis.
• • opening has to have a net section not smaller than the ventilation door and it is to be protected by means of grilles or similar devices in order to warranty a suitable ventilation section, with a ∅ 80 mm flue duct, it is necessary and sufficient a building internal or closed part having an 100 x 100 mm internal side or a ∅ 113 mm circular side in the event that the section between the flue outlet duct and the building internal or closed part is necessary for feeding the system components with carbura
2 1 Display in solar mode: - When solar function starts a solar system icon light up . - For 10 seconds after the solar pump activation, are visualized the temperature collector probe in big digits and the temperature solar tank probe (sanitary probe) in little digits. The solar system works when flat-plate solar collector temperature is higher than the temperature in solar tank in the gauge set in 5 parameter , that defines the temperature difference keeping between collector and tank.
3 SERVICING INSTRUCTIONS 3.1 First start-up tests.
This is a safety parameter which blocks the solar circulator functioning when the tank boiler is greater than the parameter. For example if we set this parameter to 85°C, when the tank exceeds 85°C the circulator functioning will block and thus the amount of heat to the tank. To make these adjustments is necessary respect the following procedure: a) to turn : i. the sanitary knob at half way, ii. the thermo knob at minimum, iii. the selector from Off position to reset.
DIP switch 5: DIP switch 6: to the time and temperature reached. It is set to ON for multi-zone systems controlled by thermostats/programmable thermostats. In this case, the remote control checks the sanitary water temperature and displays the operating status. this must be set to OFF. If accidentally set to ON, it causes error F27 this must be set to OFF if you want to operate the boiler with the remote sanitary tank.
Gas Pressure Regulation Models 5.24 & 5.32 Natural Gas Model 5.24 Model 5.32 CO2 at Max Input 9.3% 9.7% CO2 at Min Input 9.0% 9.3% Propane Gas Model 5.32 CO2 at Max Input 10.7% CO2 at Min Input 9.7% 3.2.2 Display menu. When the selector is set to Reset, three types of information on the boiler can be displayed: they can be selected using the sanitary knob.
3.3.1 Measurement and adjustment of percentage of CO2. per MERIDIAN 5.24 e 5.32 (valve system + mixer Honeywell) To set the CO2 value, do the following: ♦ Remove the front cover of the boiler; ♦ Turn the boiler control panel and unscrew the two 54 53 side screws that hold it in place. ♦ Move the boiler selector to “Chimney sweep”, a function which Fig. 15 appears on the display with a “spanner” symbol 52 and then set the heating potentiometer to 51 maximum.
B A 3.3.2 Measurement and adjustment of percentage of CO2 for MERIDIAN 3.15 (valve system + mixer SIT) The adjustment of the gas valve and consequently of the CO2 have to execute regulating before maximum flow and then minimum flow 27 ♦ ♦ ♦ ♦ To set the CO2 value, do the following: ♦ Remove the front cover of the boiler; ♦ Turn the boiler control panel and unscrew the two side screws that hold it in place.
⇒ adjust by turning the screw only 1/8 turn and waiting for at least 1 minute after every turn for the value to stabilise; ⇒ Proceed as follows to check the setting at minimum capacity: ⇒ switch the heating potentiometer to minimum; the boiler is now operating at minimum power ⇒ Adjust the fan rpm to the minimum power using trimmer P2 on the boiler PCB. The rpm are displayed on the front display as shown above when adjusting the fan speed at maximum power.
iii. the selector from the Off position to the Reset position. b) A number for the parameter selected with the sanitary knob is shown on the left of the display in small digits whereas the value is displayed in large digits: maximum heating power is adjusted with parameter 1. c) to modify the desired parameter: turn the thermo knob. The displayed value is a percentage of the maximum power of the generator.
• • • Check the soundness of the gas circuit Check that there is no presence of water leakage from the boiler internal connections Check that the condensing trap is free from obstructions, that there is a sufficient quantity of water inside and that the evacuation of the condense is correct. It Is better to avoid frequently draining of the system unless for specific alterations or repairs. In the areas subjected to freezing, the system should be drained when in disuse.
fig. 5 fig. 4 - To remove the heat exchanger and the burner : a) Screw out the four screws from the heat exchanger sides b) take off the flue thermofuse connection c) remove the spring clips pipe clamp d) loose and screw out the pump brass nuts and heating flow e) draw out the pipes from heat exchanger and then broaden the two clamps sides that block the heat exchanger; unlock pulling down to set free it from air/flue outlet.
3.14 Problems, causes and solutions. The burner ignites and then blocks (code 1 on the display) The burner doesn’t ignite The boiler doesn’t reach temperature Heating is not sufficient The boiler does not produce DHW DHW is not enough DHW is not hot enough Error code 5 or 6 on display Error code 10 on display Error code 2 on display • • • • • • • • • • • • • • • • • • • • • • • • • • The C.H.
SOLUTIONS 2) Check and replace defective parts 13) check the efficiency of the safety thermostat. If it works the boiler is overheating: check water level, expansion tank efficiency and thermal probe 3) Replace the wire 4) Replace 5)Check with selector ON the correct visualization on the display. If it is off, replace the small drive printed board 15)check the properly connection and replace if necessary 16) perform the cleaning as descriptive on par. 3.
28 36 26 21 15 27 13 25 25 29 A 17 16 14 9 23 12 18 20 31 33 19 A 6 37 10 4 3 11 30 A 5 32 29 B 19 B 24 30 B 2 1 Filtro acqua termo 34 7 35 Filtro acqua sanitaria 22 8 38 Condensa 3.15 - 5.24 - 5.
Legenda Esploso N° 1 2 3 4 5 6 7 8 9 10 Code Component description 907610203 Water gauge Ø37 scale 0-4 bar with quick coupling Integrated selector in control board 907520516 Board B&P display amber color 907520515 Regulation board B&P DIM03-SI01 907430150 Wilo circulator RSL15/6 HE KU-CLF12 907430135 Wilo circulator RSL15/7-3 KU-CRF3 Automatic air vent valve 907100005 Safety valve 3 bar 907140010 Loading tap 907170511 Electrical fan NRG 118 907170508 Electrical fan RG 128 Mod N° Code 907100115 907261
3.15 Warranty This warranty is valid provided that all the appropriate rules and standard procedures for the installation and use have been strictly observed.