Installation manual

14
2 INSTALLER INSTRUCTIONS
2.1 Boiler installation
2.1.1 General rules
The boiler installation is intended to be fixed and it must be carried out by professionally
qualified staff, according to the actual national and local law, following all the instructions
and rules contained in this manual. The boiler shall be installed in a room free of corrosive
steam.
After unpacking the boiler, ensure the integrity of the content: in doubt, do not use the
apparatus and refer to the supplier. Packaging components (carton, foam, plastic bags,
etc.) are potential hazards and should not be left within the reach of children.
In case of installation inside or between pieces of furniture, let sufficient space to carry out
standard maintenance; we would suggest to leave a 3 cm interspace between the boiler
case and the wall of the piece of furniture.
The boiler has been designed to produce hot water at a temperature below boiling point at
atmospheric pressure. It must be connected to a CH system which is compatible with its
power and technical features. It is strictly forbidden to use the equipment for other
purposes.
Any other use is improper and therefore dangerous. The manufacturer cannot be held
responsible for damages caused by improper or unreasonable use.
In the event of irregularities, defects or malfunctioning, deactivate the boiler and contact
the Sile Service Centre. They will provide original spare parts and will settle the boiler.
Only professionally qualified personnel are allowed to overhaul and repair the boiler. If the
above mentioned rules are not respected, we will decline any responsibility and will not
grant the validity of the warranty.
Before installing the boiler:
Check and washes all system pipes carefully in order to remove any impurities
and residual substances which could cause malfunction of heater exchanger
primary and secondary;
Carry out the application of sludge blanket filter in the heating circuit;
Introduce suitable inhibitor for the preservation of possible residual suspended
matters
Check the boiler fuel gas supply: compare the writing on the packaging and the technical
characteristics plate.
In case the appliance fails to operate correctly after all checks have been carried out, refer
to the authorised service provider in your area.
2.1.2. Installation room
The boiler can be installed in any type of room, provided that:
- the requirements of Gas Code AS5601 are observed.
- it is protected against freeze
- that the flue ducts can be installed adequately.