User manual
15
How to install the electrical connection
Figure ):
1 Strip 13 mm of the connecting cable insulation.
2 Insert the live conductor into terminal "L".
3 Insert the neutral conductor into terminal "N".
4 Insert the switched live conductor into terminal "
↓".
"Through-wiring" to other loads is permitted.
|
Note When switching inductive loads such as transformers, relays,
contactors or fluorescent lamps, spikes occur which could lead to
the load being switched on again ("maintained light effect").
Connect a capacitor (542895) in parallel to the inductive load to
reduce these spikes.
Installation options (Figure =):
A ARGUS constantly connected to the mains:
ARGUS monitors its area constantly.
B ARGUS combined with two-way switch:
depending on the switch position, either maintained light or
automatic mode.
C ARGUS combined with break contact:
ARGUS is always ready for operation. By pressing the push-button
(the power is briefly disconnected for 2–3 seconds), the ARGUS is
switched on for the set period. Every further movement increases
the switching duration.
D ARGUS in parallel:
Several ARGUS devices can switch a lamp group provided the
maximum switching capacity of one device is not exceeded. To
achieve this, you must reduce the sensitivity of the devices. For
technical and functional reasons, we do not advise using more
than four ARGUS devices in one group.
How to install the electrical connection
16
How to put the ARGUS into operation
E ARGUS combined with serial switch:
depending on the switch position, either manual, automatic mode
or "OFF". In position A, the luminaire is switched on by the ARGUS
(automatic) and in position B, it is switched on continuously
(manual).
F ARGUS in parallel with a staircase timer:
either the ARGUS or the staircase timer switches the luminaires
on for a certain period.
Mounting the top section of the ARGUS:
Figure ?:
1 Place the upper section of the ARGUS onto the connection box and
fasten it using the two screws provided.
|
Note: Wait until you have made all the necessary settings before
fitting caps to the screw openings, since removing them can cause
damage.
Figure >:
1 Connect the supply voltage.
The load is switched on for approx. 10 s or for the set period.
The functional display lights up for approx. 10 s.
Using operating elements:
All settings are made using the ARGUS 300 operating elements which
are located under the protective cover of the sensor head. To open:
1 Pull the cap on the sensor head at an angle of 45° about 1 cm
diagonally upwards (Figure *).
How to put the ARGUS into operation