User's Manual
Table Of Contents
- Meru Networks AP822v2 Installation Guide
- 1 About AP822
- 2 Installing AP822eV2
- 3 Installing AP822iV2 and XP8i
- 4 Mounting AP822 and XP8i
- 5 Approved Antennas
- Wall Mount AP822e Antenna Orientation
- A Regulatory Information
- Regulatory Specifications
- Declaration of Conformity, Federal Communication Commission
- Declaration of Conformity, Industry Canada
- Declaration of Conformity, R&TTE Directive 1999/5/EC
- VCCI Statement
- General Information of RF Exposure
- B Additional Notes
- Maximum EIRP
- Dual Concurrent Same Band Operation
- Manufacturing Information
- Distributed Antenna Systems (DAS)
- Air Handling Space Requirements
- Frequencies Blocked for Regulatory Compliance
- Restriction of Hazardous Substances
- C Cautions and Warnings
- Cautions
- Warnings
Box Mount 27
Figure 10: AP822 Box Mounting Screws
2. Use the desired holes as indicated in the “AP822 Box Mounting Screws” on page 27 to
mount bracket to the box.
3. Follow the wall mount installation instructions as appropriate.
Below a Standard Suspended Ceiling
The provided ceiling mounting brackets allow the AP822 to attach to suspended ceiling T-rails.
The AP ships with two different ceiling mounting bracket options to accommodate varying
sizes of ceiling T-rails. Be sure to attach the correctly-sized bracket to your AP prior to
attempting to deploy it. Note that each plastic bracket contains descriptive text to indicate the
ceiling T-rail size for which it is designed.