Install the screw
M6x25
Active chain wheel of glass
Other screws
M4x15 M4x25 ST5x25
INSTALLATION SKETCH
1.The products should be installed by technical guy who are got
the certificate or those technical who are assign by dealers. The
main power switch and electronic leakage device should be
installed.
2.The plug of electronic should be installed above the steam
generator and the length of electronic wire not less then
1800MM from the earth.
3.There are should be with main power switch for hot and cold
water pipe of steam room and the water pipe should be connect
to drainage water pipe.
4.Install the products according to the diagram of installation
When fixed the place for the products.
ILLUSTRATION OF INSTALLATION
03
2
0
0
6
9
0
1250
Cold water pipe
1800
The socket
of power and
the socket
of telephone
Hot water pipe
1
5
0
08
WS-803L
SIZE:1380X880X2150mm
S
E
A
B
1On/Off function key
2Fan function key
3Steam adjustment function key
4Radio/Telephone receive function key
5Parameter setting decrease key
AFan function indicator
6Lamp/Alarm function key
7Steam function key
8Radio tuning function key
9Radio memory key
10Parameter setting increase key
BSteam function indicator