1.25" Corrugated
2.5" Corrugated
Asshownbelowwiththenumberdesignations,installpanelagainsttheprevailingwind.
InstallWallPanelsfirstthenRoofPanels
Tominimizecorrosion,sidingpanelsshouldnotbeinstalledallthewaytotheground.
Sidingpanelsshouldlapoverthefoundationsorsplashboardsatleastthreeinches.
Makesurepanelsaresquareandplumb,toassurestraightandproperalignmentoftheentirerowofpanels.
Forareaswithhighwindconsiderations,closerfastenerspacingmayberequired.
Itisnecessarytoattachatemporaryguidetothefoundationtouseasanalignmentguidewheninstallingwallpanels.
INSTALLATION OVERVIEW
CORRUGATED PANEL INSTALLATION
Prevailing
Winds
ANGLE BASE DETAIL
(SEE PAGE 32)
CORNER DETAIL
(SEE PAGE 30)
EAVE DETAIL
(SEE PAGE 32)
GABLE DETAIL
(SEE PAGE 31)
RIDGE DETAIL
(SEE PAGE 30)
1
PANEL ENDLAP
(SEE PAGE 29)
3
5
2
4
1
2
3
J-CHANNEL