Instructions / Assembly

METAL CONDUCTS ELECTRICITY:
Do not use this equipment where contact may be made with power lines or other live electrical circuits.
FAILURE TO UNDERSTAND AND FOLLOW ALL SAFETY RULES AND ASSEMBLY INSTRUCTIONS COULD
RESULT IN SERIOUS INJURY OR DEATH.
READ BEFORE BEGINNING ASSEMBLY.
ASSEMBLY PROCESS
1. Preparation
Locate the tower, ensuring ground is level.
Unlock the interlock pins on all frames.
When installed, always move the interlock pin to
the “locked” position.
Sort the braces into horizontal and diagonal
braces - the diagonals are slightly longer.
Unlock the brace locks.
2. Base (attaching castors)
Step 1: Ensure interlock pins are removed from the
base frame
Step 2: Install castor into the leg by pushing with
manual force only, (without tool use).
Step 3: Insert the interlock pin as shown
Step 4: Lock castors before ascending any part of
the tower.
3. Locking down the platform (Windlock)
A windlock clip is installed on the platform at the hook.
This is locked as shown here.
Note the locking and unlocking position for
the castors
DO NOT OVERLOAD:
Scaffolding maximum load: 800 lb (363 kg). Platform: 25 lb/sq. ft. (122 kg/m
2
)