Instructions / Assembly

ExtErior Scaffolding
SEt Up inStrUctionS
Adjust the nuts of the levelling jack, starting at the highest point of the ground level.
The nuts at the highest ground level should be set to 3-6 in. from the top of the sill,
depending on the slope. Place the rst frame onto the base at the highest point.
Connect the rst cross brace to the frame. Allow the frame to lean slightly forward
and rest on the sill while you prepare for the next frame to be installed.
Install the second frame onto the levelling jack. Secure
the rst cross brace to the second frame.
Install the second cross brace to both frames. Next, you need to level and plumb the
scaffolding. Start at the highest point of the scaffolding. If possible, use the levelling
jack to bring the highest corner down closer to the sill. Next, bring all four corners
up to that point. If the bottom cross braces of each frame are level with each other,
then frames should also be plumb. Install the diagonal brace to keep the scaffolding
square. Check the level again and plumb if necessary. Fasten the levelling jack to the
sills with either nails or screws.
Install the deck, which may be an all aluminium platform or with wood deck or
scaffold planks. If using wooden planks, they must extend beyond the supporting
points at least 6 in. but not more than 12 in. . Secure the deck so it cannot move.
Install the guardrail posts onto the coupling pins seated in the top of the frames. Put a
pig tail lock through the top and bottom of each coupling pin to avoid any separation.
Attach the guardrails to the posts on all the exposed sides.
Select and prepare the ground area. Place suitable sills and make sure there are no
holes under the sills. Select the equipment you need and place it near the work area.
Put the adjustable levelling jack plates on the sills in the location that matches your
scaffold dimensions. Do not secure the bases to the sills at this step.
Install toeboards as required. The gap between the bottom of the toeboard
and the top of the platform must not be more than 1/2 in.
1
2
3
4
5
6
7
8
Scaffolding should be erected by at least two people. One person should be knowledgeable in erecting
scaffolding to supervise the work. These step-by-step instructions are only a general guide. The following
example is based on building a scaffolding that is 7 x 5 ft. by 1 frame high.
SET UP VIDEO
SCAN THIS CODE TO WATCH OUR SET UP VIDEO
(HTTP://MOBILE.METALTECH.CO/SETUP)
ExtErior Scaffolding - SEt Up inStrUctionS
WWW.METALTECH.CO 1 800 363-7587

Summary of content (2 pages)