Operation Manual

MI 3309 BT DeltaGT Autotest sequences
66
Figure 6.33: Differential leakage starting screen
After the measurement is carried out the Differential leakage result screen is displayed.
Figure 6.34: Differential leakage result screen
There are no special options to be set in the Differential leakage result screen.
6.5.6 Insulation resistance - P measurement
The test is offered if it is applicable according to the autotest setting. The Insulation
resistance - P starting screen is displayed first. Measurement and options in Insulation
resistance - P starting screen are described in chapter 5.2.4 Insulation resistance - P.
Figure 6.35: Insulation resistance - P starting screen
After the measurement is carried out the Insulation resistance - P result screen is
displayed.
Figure 6.36: Insulation resistance - P result screen
Options in Insulation resistance - P result screen:
NEXT
Proceeds with the next measurement.
REPEAT
Repeats the test (use in case of multiple isolated / SELV / PELV
accessible points). Lowest result will be stored.
6.5.7 Substitute Leakage - P measurement
The test is offered if it is applicable according to the autotest setting. The Substitute
leakage - P starting screen is displayed first. Measurement and options in Substitute
leakage - P starting screen are described in chapter 5.2.6 Substitute leakage - P.