Operation Manual
MI 3309 DeltaPAT Single test
40
2.00 mA, --- mA]
Measuring time [2 s, 3 s, 5 s, 10 s, 30 s, 60 s, 120 s, --- s (continuous
measurement)]
TIME
Test circuits for substitute leakage - P measurement
Figure 5.21: Measurement of Substitute leakage - P current
Figure 5.22: Measurement of substitute leakage of accessible isolated conductive parts
of fixed installed DUTs
Substitute leakage - P measurement procedure
Select the SUB. LEAKAGE-P function.
Set the test parameters.
Connect device under test to the instrument (see figure 5.21 and figure 5.22).
Press the TEST key for measurement. To stop continuous measurement press
TEST key once again.
Store the result by pressing MEM key (optional).