Operation Manual
MI 3309 DeltaPAT Automatic test sequences
54
Notes
If any of the inspections are marked as failed or if any test fails the test sequence is
stopped and the instrument automatically goes to the Result menu.
If a test parameter (limit, duration, output voltage) is changed the setup is valid only
for the particular test.
If the test limit, output voltage or test duration is changed in Shortcut autotest
sequence the autotest code will not be stored (as the settings do not correspond
with the code anymore).
6.4.1 Visual inspection
Measurement is described in chapter 5.2.1 Visual inspection.
Figure 6.4: Visual test menu
Options in Visual inspection:
PASS / FAIL
To be applied manually.
6.4.2 Earth continuity resistance measurement
The test is offered if it is applicable according to the autotest setting. The Earth continuity
starting screen is displayed first. Measurement and options in Earth continuity starting
screen are described in chapter 5.2.2 Earth continuity resistance.
Figure 6.5: Earth continuity starting screen
After the measurement is carried out the Earth continuity result screen is displayed.
Figure 6.6: Earth continuity result screen
Options in Earth continuity result screen:
Proceeds to next step.
NEXT
Repeat the test (use in case of multiple earthed points). Highest result will
be stored.
REPEAT
6.4.3 Insulation resistance measurement
The test is offered if it is applicable according to the autotest setting. The Insulation
starting screen is displayed first. Measurement and options in Insulation starting screen
are described in chapter 5.2.3 Insulation resistance.