Eurocheck CS 2099 User manual Version 1.2, Code no.
Distributor: Producer: METREL d.d. Ljubljanska cesta 77 1354 Horjul Slovenia web site: http://www.metrel.si e-mail: metrel@metrel.si © 2005 METREL Mark on your equipment certifies that this equipment meets the requirements of the EU (European Union) concerning safety and electromagnetic compatibility regulations. No part of this publication may be reproduced or utilized in any form or by any means without permission in writing from METREL.
CS 2099 Eurocheck Table of contents 1 Introduction to CS 2099 – Eurocheck ........................................................ 4 2 Safety and operational considerations...................................................... 5 2.1 Warnings ....................................................................................................... 5 2.2 Standards applied.......................................................................................... 5 3 Eurocheck description and maintenance....
CS 2099 Eurocheck Introduction to CS 2099 – Eurocheck 1 Introduction to CS 2099 – Eurocheck CS 2099 – Eurocheck is a professional, multifunctional field calibrator intended for use with Metrel installation test instruments.
CS 2099 Eurocheck Safety and operational considerations 2 Safety and operational considerations 2.1 Warnings Read and understand all warnings and cautions before using this product. This will ensure your safety, as well as keep the test equipment undamaged. q q q q q q q q q q symbol on the instrument means »Read the Instruction manual with special care«.
CS 2099 Eurocheck Eurocheck description and maintenance 3 Eurocheck description and maintenance 3.1 Front panel 9 RCD LOOP SELECT 2 3 4 5 6 CS 2099 OUTPUT Eurocheck LOOP+11 LOOP+1 RCD COM L 0.5 N 2M 5 50 M 1 50 V AC 15 10 7 Figure 3.1: Front panel 8 Note: Output connector type is country dependent. Legend: 1 ...........Insulation calibration outputs. 2 ...........LowΩ and continuity calibration outputs. Caution – do not use test currents higher than 200 mA. 3 ...........
CS 2099 Eurocheck Eurocheck description and maintenance 3.2 Side panel Note: Output connector type is country dependent. 1 2 Figure 3.2: Side panel Legend: 1 ...........Power supply cord. 2 ...........Fuse F1. Note: Eurocheck powers on automatically 2 seconds after it is connected to the mains supply. It checks for correct mains supply plug orientation during power up. If the orientation is wrong “incorrect polarity” LED lights. In such case reverse connection of power supply cord.
CS 2099 Eurocheck Eurocheck description and maintenance 3.3 Replacing fuse A fuse is located under side cover of the Eurocheck unit: q F1 T 4 A / 230 V, 32 mm × 6.3 mm General input protection fuse.
CS 2099 Eurocheck Eurocheck operation 4 Eurocheck operation 4.1 Recommended calibration sequence and practice This chapter lists recommended sequence for calibration of installation test instruments. It is not obligatory to follow this sequence. Eurocheck offers additional calibration functions (all functions are explained in detail in the following chapters). Calibration using universal test cable Step Calibrated function Purpose 1 LowΩ Determination of measurement accuracy.
CS 2099 Eurocheck Eurocheck operation 4.2 Sample test report form Caution: This sample test report form is suitable for Metrel installation test instruments like MI3100 – EurotestEASI. It could be easily modified to suit other types of instruments. q It is not based on any regulation or recommendation.
CS 2099 Eurocheck Eurocheck operation 4.3 Selecting calibration function/sub-function The following measurements can be selected with the RCD/LOOP function selection button (see Figure 3.1). Appropriate LED lights when particular function/sub-function is selected: q Fault loop and trip-lock impedance calibration (two impedance values available), q RCD trip-out time calibration and instrument test current verification. The following measurements are not indicated with LEDs on front panel.
CS 2099 Eurocheck Eurocheck operation 4.5 Fault loop impedance calibration Fault loop impedance is measured between L and PE conductors. Fault loop calibration will not trip an RCD if it’s present in installation where Eurocheck is connected, regardless of selected IΔn current. Caution: q q When performing fault loop impedance calibration Eurocheck connects fault loop calibration output to mains line impedance (L and N, important when evaluating calibration measurement results).
CS 2099 Eurocheck Eurocheck operation Note: q In some instruments the function is named “Fault loop resistance”; however the calibration procedure is the same. Figure 4.1: Performing fault loop impedance calibration using plug cable L PE N Figure 4.
CS 2099 Eurocheck Eurocheck operation 4.6 Trip-lock impedance calibration Fault loop impedance is measured between L and PE conductors. Trip-lock calibration will not trip an RCD if it’s present in installation where Eurocheck is connected, regardless of selected IΔn current. Caution: q q When performing fault loop impedance calibration Eurocheck connects fault loop calibration output to mains line impedance (L and N, important when evaluating calibration measurement results).
CS 2099 Eurocheck q Eurocheck operation Selected IΔn current will affect dissipation of measurement results. Lower IΔn currents (especially 10 mA) will cause larger variations in results. Consider accuracy of trip-lock function when evaluating calibration results (accuracy is defined in User manual of your instrument). 4.7 Line impedance calibration Line impedance is measured between L and N conductors.
CS 2099 Eurocheck Eurocheck operation 4.8 RCD trip-out time calibration Eurocheck simulates an RCD with IΔn of 30 mA and trip-out time of 50 ms. Trip-out time calibration will not trip an RCD if it’s present in installation where Eurocheck is connected, regardless of selected IΔn current. Caution: q Pay special attention when selecting appropriate IΔn current. It should be set to 30 mA, and multiplier should be set to x1. Otherwise the reading of trip-out time may be wrong.
CS 2099 Eurocheck Eurocheck operation 4.9 RCD measuring current IΔn=30 mA verification This test is part of RCD trip-out time calibration and couldn’t be performed separately – it is valid only for IΔn = 30 mA. Refer to chapter 4.8 for more information. It is essential that the test instrument measuring current is within certain limits. For example, standard EN 61557 defines low limit as IΔn – 0 %, and high limit as IΔn + 20 %.
CS 2099 Eurocheck Step 1 2 Action q q q 3 q q 4 Eurocheck operation q q 5 q 6 q 7 q q Connect tested instrument into Eurocheck insulation resistance test sockets using universal test cable, follow connection diagram shown in Figure 4.3. Switch on the tested instrument and select insulation resistance function. Set the first measuring voltage. It is not necessary to power on Eurocheck when performing insulation resistance calibration. Observe any warnings displayed on the tested instrument.
CS 2099 Eurocheck Eurocheck operation L N PE Figure 4.4: Performing low resistance calibration using universal test cable Step 1 Action q q 2 q 3 q q 4 q q 5 q 6 7 q q q Switch on the tested instrument and select LowΩ function (±200 mA measuring current). Compensate measurement leads resistance (see User manual of your instrument for further instructions).
CS 2099 Eurocheck Eurocheck operation 4.12 Voltage and frequency calibration Eurocheck offers a.c. voltage source of 50 V (at 240 V mains voltage). This source can be used for voltage and frequency calibration. It is possible (and recommended) to include second value into your calibration procedure – 0 V (short-circuited test leads, not open). Frequency is equal to mains and is usually very close to 50 Hz or 60 Hz.
CS 2099 Eurocheck Eurocheck operation PE L N Figure 4.5: Performing voltage and frequency calibration using universal test cable 4.13 Continuity and insulation of measurement leads verification Continuity of measurement leads Continuity of universal test cable measurement leads could be verified by voltage calibration between all 3 installation wires (between L and N, L and PE, N and PE). Refer to chapter 4.12 for more information.
CS 2099 Eurocheck Eurocheck operation Insulation of measurement leads Insulation of measurement leads may deteriorate over time. This can cause measurement and/or safety related problems. If insulation material leaks current measured results will be wrong. Also in such case there is a risk of electric shock when the user touches deteriorated part of insulation. Eurocheck is not needed to perform this test.
CS 2099 Eurocheck Technical specifications 5 Technical specifications 5.1 General Power supply voltage ........................ 240 V a.c. (207 V/255 V), 50 Hz/60 Hz Protection classification..................... double insulation Pollution degree ................................ 2 Protection degree.............................. IP 40 Overvoltage category ........................ CAT II 300 V Power consumption........................... 5 VA Dimensions (w × h × d) .....................
CS 2099 Eurocheck Technical specifications Voltage and frequency Reference value Accuracy 50.0 V @ 240 V a.c. ± (5 % + accuracy of mains 47.9 V @ 230 V a.c. voltage) Short-circuit current: <6 mA. Nominal output resistance: 25 kΩ. Specified accuracy is valid only if Eurocheck output is enabled. Fault loop impedance, trip-lock impedance, line impedance Accuracy Reference value (Ω)* 1.2 (LOOP+1 Ω) ±0.2 Ω 11.0 (LOOP+11 Ω) ±0.5 Ω * This value is added to the actual loop/line impedance.