Operation Manual

OmegaGTPlus / BetaGTPlus Main menu and test modes
24
Note:
Ì If any of earth bond resistance,
insulation resistance, substitute
leakage current, leakage current,
touch leakage current or TRMS
current clamp measurements have
failed or were skipped in selected
autotest sequence, the PRCD test is
prohibited!
RCD test
3.1.4 Example of creating a test sequence with VDE organizer
A periodic test of an iron will be performed.
Type: flatiron ABC
Un 230V, 50Hz, 1000VA:
The iron can be classified as followed:
Ì For a periodic testing a VDE702 test is relevant.
Ì The iron can be classified as a Class I appliance with isolated metal part and
short supply cord.
Example of test sequence configuration:
Displayed item Activity
1 Standard: VDE702
Selection of standard:
- Select VDE702.
2 Appliance class: 1
Selection of appliance safety class:
- Select Class 1.
3 Visual test
Information that visual test will be included
in the VDE702 / Class1 procedure.
4 Accessible conductive parts? YES
Question if there is an isolated conductive
part on the appliance:
- Confirm with yes.