Operation Manual

OmegaGTPlus / BetaGTPlus Measurements
69
Step 3
Step 4
Step 5 and
Step 6
Individual steps in RCD autotest
The test passes if the RCD:
Ì Does not trip out at ½×I
ΔN
tests,
Ì Trips inside predefined time limits at I
ΔN
, and 5×I
ΔN
tests.
Notes:
Ì Consider any displayed warning before starting measurement!
Ì For appliances with integrated RCD the housing must be opened to access the
RCD’s L output terminal.
Ì Mains voltage is applied to the device under test. Do not touch the equipment
under test or the test leads during the test.
5.9 Functional test
The function is intended to make functional test or check of the appliance and parallel to
this, the power consumption is measured and displayed as apparent power.
Leakage menu