Operation Manual

MI 3310 / MI 3310A SigmaGT Measurements
66
Step 5 and
Step 6
Individual steps in RCD autotest
The test passes if tested RCD:
- Does not trip out at ½I
N
tests, and
- Trips inside predefined time limits at I
N
, and 5I
N
tests.
Displayed results:
Main result ............. last measured results
Sub-results ............ all results are displayed as sub-results
Ul-pe ...................... voltage UL-PE
Notes:
Consider any displayed warning before starting measurement!
For DUTs with integrated RCD the housing must be opened to access the RCD’s L
output terminal (this should only be performed by a competent engineer).
Mains voltage is applied to the RCD under test. Do not touch the equipment under
test or the test leads during the test!
Testing B-type (P)RCD can only be performed on hardware release 2.0 and up and
firmware release 1.24 and up.
5.2.11 Functional test
The DUT’s power consumption is measured in this test. The apparent power is useful
indication for proper operation of the DUT.
Functional test menu