Operation Manual

MI 3310 / MI 3310A SigmaGT Autotest sequences
87
View results menu examples
Keys:
/
Scroll over stored results of particular functions for selected custom
autotest sequence.
PgUp (F1)
PgDown (F2)
ESC
Returns to Main menu.
6.3.2 Starting a project autotest
Starting the project autotest will apply the sequence as is defined for selected device.
Each test function that is not disabled is executed in prescribed order, see 6.5
Performing autotest sequences – appliances or 6.6 Performing autotest sequences –
welding machines. After the prescribed testing is finished, the instrument offers some
saving options.
Saving options after retesting
Keys:
SAVE (F1) Saves results, see 7.1 Saving autotest results.
VIEW (F3) Opens menu for viewing and evaluating test results. See chapter 6.3.3
Comparison of results (evaluation of result trends).
UNDO (F2)
Returns to Project autotest menu.
ESC
Exactly the same DUT data (except time and user) will be offered to store in the
selected Project autotest.
When a new autotest is saved, it will get an »I« ticker. The original autotest will get a
»I« or »PC« ticker when the DUT is retested through the project autotest.