RADIANCE R1000 PREMISE SERVICE PLATFORM MAN FD PWR LK RX LBK LK RX DIS DIS LBK Installation & User Guide 100 BASE x II FX MGT-10 AT LK DISCONNECT ALL POWER SOURCES BEFORE SERVICING Models: R1000-AAF / R1000-AAR / R1000-ADF R1000-ADR / R1000-DDF / R1000-DDR T X M M 1 AT LK A B 1 PWR DC PWR E DC IN 48V DC 1.3A ER AC IN 100-240V 50/60Hz 1.
Radiance Series R1000 Premise Service Platform: R1000-AAF ____ 2-slot platform with AC/AC front-mounted power supplies R1000-AAR ____ 2-slot platform with AC/AC rear-mounted power supplies R1000-ADF ____ 2-slot platform with AC/DC front-mounted power supplies R1000-ADR ____ 2-slot platform with AC/DC rear-mounted power supplies R1000-DDF ____ 2-slot platform with DC/DC front-mounted power supplies R1000-DDR ____ 2-slot platform with DC/DC rear-mounted power supplies Accessories: R1000-RM _____ 23-inch rack-
Table of Contents Radiance R1000 Premise Service Platform Installation & User Guide Overview .............................................................................................................. 4 Installation Guide ................................................................................................ 6 STEP 1: Unpack the Platform and Accessories .................................... 6 STEP 2: Mount the Platform ................................................................
Overview The Radiance R1000 Premise Service Platform is the demarcation point between the service provider and the customer site. It is specifically designed to address the needs of both service providers and enterprises wishing to attain the maximum isolation and management between public and private networks. Available with slots for two line cards, or one management card and one line card, the R1000 provides two redundant, load-sharing power supplies to ensure nonstop operation.
Related Documentation Refer to the following documents for additional information on the Radiance Premise Service Platform: • Radiance 100Mbps Access Line Cards Installation & User Guide • Radiance 10Mbps Single Interface Line Cards Installation & User Guide • Radiance 100Mbps Single Interface Line Cards Installation & User Guide • Radiance 10Mbps Redundant Interface Line Cards Installation & User Guide • Radiance 100Mbps Redundant Interface Line Cards Installation & User Guide • Radiance 1000Mbps Redundant
Installation Guide Follow the simple steps outlined in this section to install and start using the Radiance R1000 Premise Service Platform.
You will need four (4) additional screws (not included with the R1000) to mount the platform in the rack. FD FX PWR LK RX DIS LBK LK RX DIS LBK 100 BASE MAN T X x II M M 2 Make sure that the mounting of the R1000 does not create a hazardous condition due to an unbalanced load. Consider the overall loading of the branch circuit before installing any equipment into the rack. Reliable grounding must be maintained in the rack system. This unit is intended to be connected to earth ground.
3 Connect to the Network Connecting the Line Cards To connect the individual line cards to the network, refer to their corresponding installation and user guides. Connecting the Management Line Card If a management line card is installed in your platform, follow the procedure below to connect to the network. The management line card supports 10Base-T Ethernet. • Using a standard Category 3 or 5 UTP cable, connect the line card to your network.
5 Apply Power to the Platform Depending on the model, power connections are located on the front or rear of the R1000. When lit, the power (PWR) LEDs indicate that their corresponding power supplies are connected to an active power source and providing power to the platform’s backplane. Because the power supplies are load-sharing, both PWR LEDs are lit simultaneously. DC Power Supply Connections IMPORTANT: • For installation in a restricted access location only.
AC Power Supply Connections For AC connections, follow these guidelines: • Set the ON/OFF switch to the OFF (O) position. • Connect the power cord to the power supply receptacle on the R1000. If your platform has two AC connections, make sure each power supply is connected to a separate power source. • Set the ON/OFF switch to the ON ( | ) position. • Verify proper connection and operation using the PWR LED.
User Guide This section contains more information regarding the Radiance R1000 Premise Service Platform. Management Line Card The management card is the SNMP agent for the R1000. Connected via the backplane to the line cards in the R1000, the management card reports individual board status to Metrobility’s NetBeacon software or any SNMP application. Thus, the network administrator receives immediate information on network operations via a PC.
Operating Features of the Load-Sharing Power Supplies The R1000 Premise Service Platform is shipped with two 12V internal fixed power supplies. Depending on the model, these load-sharing power supplies are designed for AC and/or DC power sources. The two power supplies are designed to operate in tandem and share the load. If the power source to one of the supplies fails, the other power supply automatically provides the entire power load to the platform.
Topology Solutions CO/POP SNMP Control Radiance R5000 Customer Premises ing ort Rep ath sP tus ion Sta cat uni h = 0 mm idt Co ndw ote d Ba e ns Rem Us ctio tru Ins tion ura nfig Co Radiance R1000 Radiance R1000 Premise Service Platform 13
R1000 Technical Specifications Power AC: __________________________________ 100 to 240V AC, 50/60Hz, 1.0A DC: ________________________________________________ 48V DC, 1.
Product Safety, EMC and Compliance Statements This equipment complies with the following requirements: • UL/cUL • CE • EN60950 (safety) • FCC Part 15, Class A • EN55022 Class A (emissions) • EN55024: 1998 (immunity) • Class 1 Laser Product • VCCI • DOC Class A (emissions) • NEBS Level 3 Certification (DC only) This product shall be handled, stored and disposed of in accordance with all governing and applicable safety and environmental regulatory agency requirements.
Warranty and Servicing Three-Year Warranty for the Radiance R1000 Premise Service Platform Metrobility Optical Systems, Inc. warrants that every Radiance R1000 Premise Service Platform will be free from defects in material and workmanship for a period of THREE YEARS from the date of Metrobility shipment. This warranty covers the original user only and is not transferable.
Caution: Danger of explosion if the battery on the management line card is incorrectly replaced. Replace only with the same or equivalent type recommended by the manufacturer. Dispose of used batteries according to the manufacturer’s instructions.
Product Manuals The most recent version of this manual is available online at http://www.metrobility.com/support/manuals.htm Product Registration To register your product, go to http://www.metrobility.com/support/registration.asp 25 Manchester Street, Merrimack, NH 03054 USA tel: 1.603.880.1833 • fax: 1.603.594.2887 www.metrobility.