User guide
■■■■■■■■■■■■■■■■■■■■■■
3 Installation
860 KF Thermoprep
■■■■■■■■
21
5
Shift the height of the tip of the heating tube vertically in such a way
that the outlet opening of the tubing is immersed as deeply as possi-
ble. The tip must not however be permitted to get in the way of the
stirring bar in the KF titration cell. Afterwards give the septum stop-
per its final tightening.