Owner manual

■■■■■■■■■■■■■■■■■■■■■■
3 Installation
■■■■■■■■
17
3
If necessary, correct the angle value.
4
Move to External position 2 (16-2).
5
Check whether the sample tube is centered over the "Rinsing unit -
Disposal" position.
Figure 18 Working range - Disposal
6
If necessary, correct the angle value.
7
Move to External position 3 + 4 (16-3), (16-4).
8
Check whether the sample tube is centered precisely over the open-
ing of the dilution unit.
Figure 19 Working range - Dilution unit
9
If necessary, rotate the cover of the mixing vessel until the opening is
centered under the sample tube.
10
If necessary, correct the angle value.