User Manual

■■■■■■■■■■■■■■■■■■■■■■
3 Installation
IC equipment: Liquid Handling Station
■■■■■■■■
5
3 Installation
3.1 Installing the Liquid Handling Station
The Liquid Handling Station forms part of the IC equipment: Liquid Han-
dling Station.
1
Installing the Liquid Handling Station
Install the Liquid Handling Station on the left side of the Sample Pro-
cessor (see manual for the Liquid Handling Station).
3.2 Installing the rinsing solution flow path
The Sample Processor's peristaltic pump transfers ultrapure water to the
Liquid Handling Station's rinsing unit. In the rinsing unit, the Sample Pro-
cessor needle is cleaned after each sample aspiration.
We recommend that you install the Metrosep I Trap 1 - 100/4.0
(6.1014.200) column between the supply bottle and the peristaltic pump.
This trap column removes ionic contamination from the ultrapure water.
Preparing the supply bottle
Required accessories
Clear glass bottle (6.1608.070)
PEEK capillary (6.1831.180)
Bottle cap (6.1602.160) with O-ring, M6 tubing nipple and M8 stopper
Adapter for adsorber tube (6.1624.000)
Adsorber tube (6.1619.000)
Capillary cutter (6.2621.080)
1
Fill the clear glass bottle with ultrapure water.