User Manual
■■■■■■■■■■■■■■■■■■■■■■
3 Installation
IC equipment: Liquid Handling Station
■■■■■■■■
7
5
Setting the capillary to the correct length
■ Push the capillary far enough into the bottle that it reaches the
bottom of the bottle.
■ Tighten the tubing nipple.
The capillary is secured.
6
Inserting the stopper
■ Screw the M8 stopper into the M8 opening of the bottle cap.
7
Filling the adsorber tube
Fill the adsorber tube as follows:
■ some cotton
■ CO
2
adsorber material
■ some cotton
Seal the adsorber tube with the stopper.