User Manual

■■■■■■■■■■■■■■■■■■■■■■
3 Installation
IC equipment: Liquid Handling Station
■■■■■■■■
9
Installing the capillary between the trap column and the
peristaltic pump
Required accessories PEEK capillary (6.1831.180)
Pressure screw (6.2744.010)
Pump tubing with yellow stoppers (6.1823.390)
Coupling olive/UNF 10/32 (6.2744.034)
Capillary cutter (6.2621.080)
1
Preparing the pump tubing
Attach a coupling olive/UNF 10/32 (6.2744.034) to each end of
the pump tubing.
(See the chapter "Installing the peristaltic pump" in the manual
for the Sample Processor.)
2
Cutting the capillary to size
Cut off a piece of approx. 70 cm from the long capillary using the
capillary cutter.
3
Mounting the capillary
Tighten one end of the capillary to the trap column outlet using a
pressure screw.
Tighten the other end of the capillary to the pump tubing inlet
using a pressure screw.
Installing the capillary between the peristaltic pump and
the Liquid Handling Station
Required accessories
PEEK capillary (6.1831.180)
Pressure screw (6.2744.010)
Pump tubing with yellow stoppers (6.1823.390)
Liquid Handling Station (6.2841.120)