User Manual
3.2 Installing the rinsing solution flow path
■■■■■■■■■■■■■■■■■■■■■■
10
■■■■■■■■
IC equipment: Liquid Handling Station
■ Capillary cutter (6.2621.080)
1
Cutting the capillary to size
■ Cut off a piece of approx. 60 cm from the long capillary using the
capillary cutter.
2
Mounting the capillary
■ Tighten one end of the capillary to the pump tubing outlet using a
pressure screw (6.2744.010).
■ Tighten the other end of the capillary to the rinsing unit inlet (2-4)
using a pressure screw (6.2744.010).
Completing the installation
1
Mounting the drainage tubing
Use the PVC tubing from the accessories for the Liquid Handling Sta-
tion as drainage tubing.
■ Push one end of the PVC tubing over the waste connector (2-9)
of the rinsing unit.
■ Guide the other end of the PVC tubing to the waste container.
2
Installing the peristaltic pump
■ Insert the pump tubing in the tubing cartridge (see manual for
the Sample Processor).
■ Insert the tubing cartridge in the cartridge holder (see manual for
the Sample Processor).
3
Placing the supply bottle
■ Place the supply bottle next to the Sample Processor.