User Manual

3.2 Installing the rinsing solution flow path
■■■■■■■■■■■■■■■■■■■■■■
10
■■■■■■■■
IC equipment: Liquid Handling Station
Capillary cutter (6.2621.080)
1
Cutting the capillary to size
Cut off a piece of approx. 60 cm from the long capillary using the
capillary cutter.
2
Mounting the capillary
Tighten one end of the capillary to the pump tubing outlet using a
pressure screw (6.2744.010).
Tighten the other end of the capillary to the rinsing unit inlet (2-4)
using a pressure screw (6.2744.010).
Completing the installation
1
Mounting the drainage tubing
Use the PVC tubing from the accessories for the Liquid Handling Sta-
tion as drainage tubing.
Push one end of the PVC tubing over the waste connector (2-9)
of the rinsing unit.
Guide the other end of the PVC tubing to the waste container.
2
Installing the peristaltic pump
Insert the pump tubing in the tubing cartridge (see manual for
the Sample Processor).
Insert the tubing cartridge in the cartridge holder (see manual for
the Sample Processor).
3
Placing the supply bottle
Place the supply bottle next to the Sample Processor.