Owner manual

1.2 About the documentation
■■■■■■■■■■■■■■■■■■■■■■
2
■■■■■■■■
IC-Ausrüstung: MiPT
1.2 About the documentation
This manual describes the installation of the IC-Ausrüstung: MiPT and the
connection of the capillary connections between the supply bottle, the
Dosino and the injection valve in the ion chromatograph.
CAUTION
Please read through this documentation carefully before putting the
equipment into operation. The documentation contains information
and warnings which the user must follow in order to ensure safe opera-
tion of the equipment.
Additional documentation
Topic Document
Mounting the Liquid Handling Station on
the Sample Processor
Manual for the Liquid Handling Station
Installing the Dosino Manual for the Dosino
Care and maintenance of the dosing unit Manual for the dosing unit
1.2.1 Symbols and conventions
The following symbols and formatting may appear in this documentation:
Cross-reference to figure legend
The first number refers to the figure number, the sec-
ond to the instrument part in the figure.
Instruction step
Carry out these steps in the sequence shown.
Method Dialog text, parameter in the software
File New Menu or menu item
[Next] Button or key
WARNING
This symbol draws attention to a possible life-threat-
ening hazard or risk of injury.
WARNING
This symbol draws attention to a possible hazard due
to electrical current.